Choosing the model
CPU, memory and drives follow the measured load of your systems, not a price list. NVMe storage when the database keeps waiting on disk, extra RAM when reports are calculated in memory.
Two parties share the responsibility for a dedicated machine: the facility for metal and electricity, us for everything running on top. What matters is that the dividing line is written down.
CPU, memory and drives follow the measured load of your systems, not a price list. NVMe storage when the database keeps waiting on disk, extra RAM when reports are calculated in memory.
Located in Austria or elsewhere in the EU, with dual power and network feeds, contractually fixed turnaround for part swaps, and a processor agreement that slots into your GDPR documentation.
A RAID layout suited to the workload, the OS, an internal network linking several machines, and out-of-band console access that lets us in even if the server will not boot.
With Proxmox or Hyper-V the hardware can be split into virtual machines: inventory system, file shares and terminal server neatly separated, each with its own resources and maintenance slot.
A firewall in front, VPN access for branch offices and home workers, and separate networks for management and applications. Only approved services can be reached from outside.
A daily backup to external storage that cannot be deleted early. If an hour of downtime costs more than a second machine, we add a replicated standby.
Updates, watching drive and RAID health, reporting faults to the facility, checking things after every part swap, and a yearly look at whether size and cost still add up.
Timing depends mainly on how soon the provider can supply the model. We run through the entire move once as a rehearsal before a real date is set.
We log CPU, memory, disk and network activity on your existing systems for a week, ideally including a month-end close or a stocktake.
One or two models with rent, licences and management spelled out, set against the cost of a large VPS. You choose on evidence rather than gut feeling.
A complete installation followed by a practice migration with a stopwatch running. The time it takes defines the switch-over window, always after hours.
Move to the new machine, sign-off with your main users, then normal operation with monitoring and a patch schedule.
Licences can outprice the hardware. Windows Server and Microsoft SQL Server are usually licensed by processor core. A machine with twice the cores may look like a bargain on rent yet double your licence bill, even though your inventory software never uses the extra cores. So we always price rent and software together, and we often recommend a box with fewer but faster cores.
Common models are often provisioned within a few working days, while special configurations can take several weeks. Including the rehearsal migration, plan on two to four weeks until go-live.
Monitoring flags the fault, we open a ticket with the facility, their staff swap the drive and we watch the array rebuild. The server keeps running meanwhile. Bear in mind that RAID only guards against hardware faults, not deletions or ransomware; the off-site backup covers those.
That is called colocation. It is possible, but it involves racking, cabling and replacing parts on site, which we do not do, so you would need a local partner for it. Renting spares you all that, since the facility owns and maintains the hardware.
First we transfer everything to the new target system and delete it from the old server. How the facility then handles the drives, and whether it issues a deletion certificate, is something we clarify with the provider in advance. If you receive one, it goes into your data protection records.
Monday to Friday, 8:00-17:00 Austrian time (CET/CEST), within your plan's response time: 4 hours on Start, 1 hour on Business, 15 minutes on Premium. Premium clients additionally receive a 24/7 on-call number, set out in their contract.
Outline which systems need to run, roughly how large your databases are and whether there are location constraints. We will reply with suitable models and their total cost.
Your enquiry has arrived
Our reply reaches you within one working day. Outages that leave your staff unable to work are dealt with first.
We could not find that town. Try another spelling, or choose whichever provincial capital lies closest; as everything is handled remotely, you get the same service in all nine Austrian states.